New Wastewater Facility Launches in Fuzhou: 40,000 Tons Daily Capacity, Serving 435,000 Residents

Deep News
07/25

On July 24, the second phase of the Changle Urban Wastewater Treatment Plant officially commenced operations. The project, with a total investment of approximately 178 million yuan, spans 54 mu (about 3.6 hectares).

Changle Urban Wastewater Treatment Plant Phase 2 is primarily responsible for collecting and treating domestic and industrial wastewater from the Changle main urban area, as well as Yingqian, Shouzhan, Yutian, and Liren districts. The facility currently serves a population of 435,000.

The plant, located in Xiazhu Village, Hangcheng Street, west of Taiping Port, began construction in October 2023. It is designed with a total treatment capacity of 40,000 tons per day, with initial equipment installed for a 20,000-ton-per-day standard configuration.

Utilizing a combined process of modified AAO biological treatment, high-efficiency sedimentation, cloth filter filtration, and sodium hypochlorite disinfection, the plant's effluent quality strictly meets the Class 1A discharge standard of the "Pollutant Discharge Standards for Urban Wastewater Treatment Plants."

Changle Urban Wastewater Treatment Plant Phase 2 establishes an integrated system for wastewater collection, transportation, and treatment. This will effectively address the existing wastewater treatment shortcomings in the area, continuously improve water environment quality, and consolidate the achievements of aquatic ecological restoration.

免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。

热议股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10