MCC logs RMB206.10 billion in Q1 2026 new contracts; overseas deals reach RMB13.19 billion

Bulletin Express
04/15

Metallurgical Corporation of China Ltd. (MCC) reported that newly signed contracts for January–March 2026 totalled RMB206.10 billion, according to a filing released on 15 April 2026. Overseas projects accounted for RMB13.19 billion, representing 6.40 % of the quarterly intake.

In March, MCC concluded four domestic and overseas engineering agreements exceeding RMB1 billion each:

• Tangshan Jingtang Smart Port Science and Technology Innovation Demonstration Park Urban Renewal Project, awarded to China MCC 22 Group, valued at RMB12.54 billion. • Engineering general contracting for the second bidding section of the Qingteng Town Project (Start-up Area), undertaken by China MCC 5 Group, worth RMB1.19 billion. • Steel-structure subcontract for the Electric Vehicle Supplier Park (ASP) in Saudi Arabia, secured by MCC International Incorporation, amounting to RMB1.14 billion. • EPC general contract for Phase I of the Nanjing North Station Science and Technology Innovation Hub, assigned to MCC TianGong Group, valued at RMB1.07 billion.

All figures are preliminary and subject to confirmation in forthcoming periodic reports.

免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。

热议股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10