Xi'an District Safely Relocates 2,480 People After Loess Landslide, Ministry of Natural Resources Issues Commendation

Deep News
11/19

At 14:57 on November 10, a loess landslide occurred in Group 1 of Siqing Village, Dizhai Subdistrict, Baqiao District, Xi'an. Because local government and relevant departments firmly tightened disaster prevention responsibilities and measures, with timely inspections, information reporting, on-site assessment, and monitoring and early warning all in place, and with the "hidden danger point plus risk area" dual-control approach effectively implemented, threatened residents were organized to relocate and take shelter in advance, and no casualties were caused.

Recently, the Ministry of Natural Resources issued a commendation to the Shaanxi Provincial Department of Natural Resources, the Xi'an Municipal Natural Resources and Planning Bureau, the Baqiao Branch of the Xi'an Municipal Natural Resources and Planning Bureau, relevant technical support units, and frontline mass monitoring and prevention personnel who performed outstandingly in this successful risk avoidance process.

Aerial photo taken before the landslide occurred. It is learned that on November 4, an inspector in Group 1 of Siqing Village discovered obvious new cracks and ground subsidence on the village road during routine patrols and reported it immediately. Local authorities continued tracking and observation, finding that house cracks had significantly widened and slope deformation was continuously intensifying. On November 9, the Baqiao Branch of the Xi'an Municipal Natural Resources and Planning Bureau organized technical personnel from relevant units to rush to the site for investigation and assessment, and immediately guided the full evacuation of 35 threatened personnel from a nearby unit. At 14:57 on November 10, the landslide occurred. The landslide body was approximately 60 meters long, 100 meters wide, and 15 meters thick, with a volume of about 90,000 cubic meters. It caused damage to 23 dormitory rooms of the unit and about 100 meters of road, with direct economic losses of approximately 900,000 yuan.

Road surface subsidence expanding before the landslide. After the landslide occurred, the Xi'an Municipal Natural Resources and Planning Bureau, together with the Baqiao District Government and the District Emergency Management Bureau, the Baqiao Branch, Dizhai Subdistrict, and the power department, quickly rushed to the scene for consultation and assessment. They decisively expanded the evacuation scope, relocating teachers and students from 3 student dormitory buildings of a nearby school and 2,445 people under safety threat to safe areas. On November 11, relevant officials from the Shaanxi Provincial Department of Natural Resources rushed to the scene to guide emergency response work, dispatched a technical guidance team, and installed 12 emergency monitoring devices. The Xi'an Municipal Natural Resources and Planning Bureau allocated one geological slope radar to conduct dynamic monitoring of the landslide body. Technical support units immediately dispatched relevant personnel and expert groups to conduct a comprehensive investigation around the landslide area, simultaneously carrying out aerial photography, 3D modeling, and dynamically tracking slope deformation trends to strictly prevent secondary disasters.

The commendation pointed out that this successful risk avoidance is a vivid practice of the "people first, life first" philosophy being implemented at the grassroots level, with five main aspects of experience and practices. First, non-flood-season prevention was not relaxed, and routine inspections proved effective. By the time of the incident, it was already November, and Shaanxi Province's main flood season had ended, but the grassroots disaster prevention front did not "stand down once the flood season passed," still maintaining the normalized operation of the mass monitoring and prevention system. Inspectors persisted in daily patrols and section-by-section inspections, capturing new road cracks, subsidence, and other danger signs at the first opportunity, winning valuable time for subsequent assessment and response. Second, risk area management and control were solidly implemented, and dynamic ledgers played a role. This location was not within the scope of traditionally registered geological disaster hidden danger points, but it had been designated as a risk area and placed under dynamic management and control, with inspection responsible persons, monitoring measures, and control requirements implemented. After the danger appeared, the grassroots level was able to quickly locate the risk unit and rapidly initiate a response, achieving a shift from "managing registered hidden danger points" to "hidden danger point plus risk area" dual control. Third, the combination of mass and professional assessment was accurate, and decisive evacuation decisions were made. After grassroots inspectors discovered the danger, technical support units immediately went to the site for verification and assessment, not waiting or relying on others, and made prompt decisions, organizing the evacuation of 35 threatened people one day before the landslide occurred, translating the "three avoidances" and "three emergency evacuations" requirements into practical results. Fourth, expanded management and control kept pace, with no gaps in closed-loop handling. After the landslide occurred, local authorities did not just deal with the immediate matter but, targeting the characteristics of loess landslides, decisively expanded the evacuation scope to 2,445 people, simultaneously sealing off dangerous areas, strengthening monitoring and early warning, and strictly preventing residents from returning without authorization, achieving a full-chain closed loop of early warning, notification-response, relocation, control, and review. Fifth, technological support kept up closely, with monitoring and investigation carried out simultaneously. After the landslide, local authorities immediately allocated slope radar and monitoring equipment, organized expert groups to conduct aerial photography, 3D modeling, and used technical means to closely track slope deformation trends, providing a basis for subsequent investigation and treatment.

The Ministry of Natural Resources required that natural resources departments at all levels earnestly study and learn from this successful risk avoidance approach, deeply understand the hidden, sudden, and lagging characteristics of geological disasters, resolutely overcome the paralyzed mindset and lax attitude of "the flood season is over, risk is zero," and treat geological disaster prevention as year-round work with unremitting effort. They should continuously improve the mass monitoring and prevention system, solidly implement "hidden danger point plus risk area" dual-control management, intensify inspections of key risk units such as plateau edges and steep slopes, slope-cut housing construction, slope-side factory dormitories, and rural houses, improve short-term imminent warning and "notification-response" feedback mechanisms, strictly implement the rigid requirement of advance relocation, and effectively enhance grassroots risk identification and pre-disaster response capabilities to fully safeguard people's lives and property.

It is understood that in recent years, under the leadership of the municipal party committee and municipal government and with the guidance and support of the provincial department, the city's resource and planning system has continuously strengthened the "four mechanisms" of geological disaster prevention, consolidated the full-chain closed-loop disaster prevention system, and made every effort to prevent geological disaster risks. The system has tightened four-level grid-based prevention and control responsibilities, implemented "hidden danger point plus risk area" dual-control management, and strengthened supervision and scheduling. Relying on InSAR, drones, and other technologies, multiple rounds of hidden danger investigations have been carried out to dynamically manage new risk points. Multi-department early warning consultation has been deepened, the "123" notification-response mechanism has been implemented, early warning information has been released through multiple channels, and early warning accuracy has been improved. Normalized disaster prevention publicity and drills have been carried out, the "four uniform" requirements have been strictly enforced, and all those who should be relocated have been relocated. Round-the-clock duty shifts have been maintained, emergency technical forces have been fully equipped, and while accelerating relocation for risk avoidance and engineering treatment, hidden dangers have been systematically eliminated to effectively protect people's lives and property.

This hidden danger was not within the traditionally registered hidden danger points, but it had been incorporated into dynamic management and control of geological disaster risk areas, with inspection responsibilities implemented, achieving a shift from single management of registered hidden dangers to "hidden danger point plus risk area" dual control. At the same time, relying on the mass-professional combination mechanism and strictly implementing the "three avoidances" and "three emergency evacuations" requirements, a complete closed loop of inspection and reporting, assessment and early warning, relocation and evacuation, sealing and control, and dynamic monitoring has been established.

Next, the Xi'an Municipal Resource and Planning Bureau will take this commendation as an opportunity to continuously tighten geological disaster prevention responsibilities, improve the mass monitoring and prevention system, intensify inspections in key areas such as plateau edges and steep slopes, slope-cut housing construction, and slope-side factories, make good use of technological monitoring methods, continuously enhance pre-disaster identification and emergency response capabilities, and fully protect people's lives and property.

免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。

热议股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10