Zhejiang to Add Multiple New High-Speed Railway Stations

Deep News
10/09

Attention, everyone! High-speed railway construction in Zhejiang is in full swing. The Hangzhou Airport High-Speed Railway and the new Shanghai-Hangzhou High-Speed Railway will add multiple new stations. Let's take a look.

Basic Overview of the Hangzhou Airport High-Speed Railway Project

The Hangzhou Airport High-Speed Railway starts from Tongxiang Station, passes through Tongxiang City and Haining City in Jiaxing City, crosses the Qiantang River and heads south, passes through Qiantang District and Xiaoshan District in Hangzhou City and Keqiao District in Shaoxing City, and finally reaches Shaoxing North Station. The newly built main line is approximately 72 kilometers long, of which the Tongxiang to Qiantang section is about 34 kilometers with a designed speed of 350 kilometers per hour, and the Qiantang to Shaoxing section is about 38 kilometers with a designed speed of 250 kilometers per hour. A connecting line of about 13 kilometers from Hangzhou South Station to Xiaoshan Airport Station is also planned, with a designed speed of 160 kilometers per hour. The planned construction period for the project is 4 years.

The entire line will include stations such as Tongxiang, Haining Guanchao, Qiantang, Xiaoshan Airport, and Shaoxing North. Among them, Haining Guanchao, Qiantang, and Xiaoshan Airport are newly built stations.

Basic Overview of the New Shanghai-Hangzhou High-Speed Railway Project

The new Shanghai-Hangzhou High-Speed Railway will commence full-scale construction within 2026. The preliminary phase of the project broke ground in September 2025, with a total construction period of 4 years, meaning it is expected to be completed by 2029. The Shanghai-Hangzhou High-Speed Railway is located in the southern part of Shanghai and the northern part of Zhejiang Province. The line starts in the east at the under-construction Shanghai East Station of the Oriental Hub, utilizes the second phase of the Shanghai-Suzhou-Nantong Railway to Situan Station, connects with the under-construction Nantong-Ningbo High-Speed Railway via Jiaxing South Station in the Jiaxing area, links with the under-construction Hangzhou Airport High-Speed Railway via Tongxiang Station, and terminates at Hangzhou West Station. The newly built main line is approximately 197 kilometers long (about 54 kilometers in the Shanghai section and about 143 kilometers in the Zhejiang section), with a designed speed of 350 kilometers per hour. The entire line will have 9 stations in total, including 4 newly built stations: Fengxian, Shanghai Jinshan, Pinghu City, and Linping North; 4 stations to be renovated and expanded: Situan, Jiaxing South, Tongxiang, and Hangzhou West; and 1 existing station to be utilized: Shanghai East.

免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。

热议股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10