Gullewa Says Unit Reports Results From Drilling at Western Australia Projects

MT Newswires Live
2025/01/17

Gullewa (ASX:GUL) said Central Iron Ore released results for a 2024 first-phase reverse circulation drilling campaign at the South Darlot gold project and a 2024 first-phase diamond drilling campaign at the British King project, both in Western Australia, according to a Friday Australian bourse filing.

Assay results for the 31-hole 1,998-meter drilling program at the South Darlot project reported significant intercepts, including 1 meter at a grade of 9.5 grams per tonne (g/t) of gold from a depth of 67 meters.

Assay results for the six-hole 334.2-meter drilling program at British King also reported significant intercepts, including 3 meters at a grade of 22.7 g/t of gold from 57 meters.

Gullewa holds a 51% stake in Central Iron Ore.

It said further diamond and reverse circulation drilling for metallurgical, structural, and petrographic test work will be conducted.

免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。

热议股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10