Mineral Resources (ASX:MIN) shipped 5.2 million wet metric tonnes (wmt) of attributable iron ores in the fiscal second quarter from its Onslow Iron, Pilbara, and Yilgarn hubs, up from 4.5 wmt in the first quarter, according to a Thursday filing with the Australian bourse.
The average quarterly realized price across all three hubs was $84 per dry metric tonne (dmt), up 3% from $82 the previous quarter, the filing said.
Total spodumene production for the three sites was 136,000 dmt, with 143,000 dmt shipped at an average price of $827 per dmt on an SC6 category in the quarter, the filing added. Output in the first quarter was 157,000 dmt.
The company's mining services division produced 68 million tonnes of ore, in line with the September 2024 quarter, as per the filing.
免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。