Sino Geophysical (SHE:300191) and subsidiary Smart Oil have started production at the Weizhou 5-3 oilfield, a joint venture with CNOOC (SHA:600938, HKG:0883) in China's Beibu Gulf.
The project launched on June 6, with 10 development wells planned, according to a Monday filing with the Shenzhen bourse. Smart Oil holds a 49% stake in the project, while CNOOC holds 51%.
The first well is now online, with full capacity of about 10,000 barrels of oil equivalent daily expected by 2026.
免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。