Dakota Gold Corporation has announced promising initial results from its 2025 drill campaign at the Richmond Hill Oxide Heap Leach Gold Project. The campaign's early assay results from 19 drill holes align with previous findings, notably including a significant intersection of 1.94 grams per tonne of gold over 60 meters, with 51.9 meters potentially suitable for heap leaching. The company currently operates two drills at the site, aiming to complete 24,384 meters of drilling using both Reverse Circulation and Core drilling techniques. These efforts are part of a larger strategy to define oxide and sulfide boundaries and prepare for a comprehensive Feasibility Study expected in early 2027. Dakota Gold is also working on an Initial Assessment with Cash Flow, targeting a 30,000 ton per day crushing circuit by mid-2025.
免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。