Inventus Mining Corp. has announced promising results from its grade-control drilling at the Pardo Gold Project, located 65 km northeast of Sudbury, Ontario. The drilling at the Trench 1 Bulk Sample Site revealed approximately 10,000 tonnes of material within 6 meters of the surface, with a weighted average grade of 4.10 gpt gold and a thickness of 1.78 meters. The top drill intercepts included grades as high as 12.59 gpt gold over 1.79 meters. The bulk sampling program is progressing on schedule, with the first 5,000-tonne sample from 007 North expected to be processed in late July, followed by the 10,000-tonne sample from Trench 1 in late August to early September. Inventus Mining Corp. is optimistic about the project's potential, having secured a processing path through McEwen Mining's Stock Mill, and sees this as a significant step towards de-risking the project and demonstrating the strong economics of extracting near-surface gold mineralization.
免责声明:投资有风险,本文并非投资建议,以上内容不应被视为任何金融产品的购买或出售要约、建议或邀请,作者或其他用户的任何相关讨论、评论或帖子也不应被视为此类内容。本文仅供一般参考,不考虑您的个人投资目标、财务状况或需求。TTM对信息的准确性和完整性不承担任何责任或保证,投资者应自行研究并在投资前寻求专业建议。