Bellevue Gold (ASX:BGL) said gold poured for the September quarter was 29,950 ounces, with a record production volume of 296,000 tonnes processed at a grade of 3.2 grams per tonne (g/t) of gold, following 259,000 tonnes of ore mined during the quarter at 3.2 g/t grade of gold, according to a Tuesday Australian bourse filing.
The mined grades are expected to increase in the December quarter as stope tonnes sourced from higher-grade parts of the mine increase in line with the mine schedule.
The operations are also well set up for increasing production through fiscal 2026 as the mining sequence moves to higher-grade stoping areas in the Deacon, Viago, and Deacon North mining areas.