Gold Hydrogen (ASX:GHY) said its Ramsay 3 well in South Australia was spudded on Nov. 10 and it reached a total depth of 884.2 meters on Nov. 27, while the production casing was run to total depth on Nov. 29, with the rig released from Ramsay 3 on Sunday, according to a Tuesday Australian bourse filing.
Wireline logs identified several anomalous zones of elevated natural hydrogen and helium levels via the SLB DQ1000 gas detection tool. Air-corrected natural hydrogen purities of up to 97% were obtained from sampled intervals in the Parara formation.
The rig is shifting and rigging up to drill Ramsay 4.