MCC Announces RMB248.03 Billion in New Contracts for Jan–Apr 2026; April Adds RMB8.04 Billion Across Three Major EPC Projects

Bulletin Express
05/15

Metallurgical Corporation of China Ltd. (MCC) reported that newly signed contracts reached RMB248.03 billion between January and April 2026, with overseas contracts contributing RMB14.17 billion during the same period.

In April alone, MCC secured three engineering and construction contracts—each exceeding RMB1 billion—for a combined value of RMB8.04 billion:

• RMB4.70 billion EPC contract for mining exploitation and processing services at the Fulin Construction Sandstone Mine in Wuzhou, awarded to Zhongye Changtian International Engineering.

• RMB2.05 billion design-and-build contract for the urban village renovation (Plot 02, Lezhu Area) in Guangzhou’s Huangpu District, undertaken by China MCC 22 Group.

• RMB1.29 billion general contracting mandate for commercial, residential and supporting works at the Longhu High School Affiliated Station TOD plot on the East Guangdong Intercity Railway, awarded to China MCC 5 Group.

The company notes that these figures are preliminary and subject to confirmation in forthcoming periodic reports.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10