80 Million Yuan State Capital Injection! Xinjiang 300MW Solar Desertification Control Project Opens Bidding

Deep News
09/27

Recently, Jiangxi Nianhua Engineering Consulting Co., Ltd. launched a public tender for the design, procurement, and construction of the EPC general contracting project for the Shache 300,000-kilowatt photovoltaic desertification control integration project.

The tenderer for this project is Zhongneng Digital Technology (Jiangxi) Co., Ltd., with project funding sourced from state capital amounting to 800 million yuan. The project is located in Shache County, Kashgar Prefecture, Xinjiang Uygur Autonomous Region.

Regarding scale, the main construction scope includes a DC-side capacity of 360,000 kilowatts and an AC-side capacity of 300,000 kilowatts. Based on the project capacity and surrounding grid conditions, one new 220kV booster collection station is planned, connected to the Kashgar power grid via a single 220kV line approximately 17 kilometers in length. Specifics are subject to approval of the system access report.

The tender documents are as follows:

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10