Tesoro Gold (ASX:TSO) said that the results of an extensional and infill drilling program at the El Zorro gold project in Chile intersected a wide, shallow zone of gold mineralization, according to a Thursday Australian bourse filing.
Assay results from 14 diamond holes drilled returned intercepts of 68.23 meters at 1.18 grams per tonne grade of gold from a depth of 32.77 meters as well as 26.97 meters at 2 g/t grade of gold from 105.25 meters.
It said that drilling is ongoing, with a focus on mineral resource estimate expansion at the northern and southern ends of the Ternera deposit.