ioneer (ASX:INR) is finalizing a mine plan to prioritize stream one high-boron lithium ore due to its higher contained metal value and superior economic returns at the Rhyolite Ridge lithium-boron project in Nevada, according to a Tuesday Australian bourse filing.
The project comprises three distinct ore types based on primary mineralogy: stream one, stream two, and stream three.
The streams two and three low-boron lithium mineralization are largely excluded as feed to the vat leach process plant and will be either stockpiled or left in situ.
Falcon gravity concentrator testwork was performed on samples from streams two and three material. The testwork demonstrated the ability to achieve material increases in both lithium grade and lithium yield, combined with significant mass rejection.
The current planned 2.5 million tonnes-per-annum processing plant aims to process high-boron lithium ore.
免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。