Cyclone Metals Progresses Development of Canada Iron Ore Project; Shares Rise 3%

MT Newswires Live
2025/05/07

Cyclone Metals (ASX:CLE) said it progressed the development of its Iron Bear iron ore project in Canada, advancing the engineering workstream and completing the fourth phase of metallurgical test work, according to a Wednesday Australian bourse filing.

It secured the key commercial engagements with subcontractors for drilling, power, rail, environmental, social, and community studies.

The fourth phase of metallurgical test work was completed, with 17.7 tons of sediment processed in the project's pilot plant.

It produced 2.3 tons of direct reduction concentrate, grading 71% of iron and 1.2% of silicon dioxide, with very low deleterious elements. It also produced 3.5 tons of blast furnace concentrate, grading 69.1% of iron and 3.5% of silicon dioxide.

260 kilograms of direct reduction pellets were produced, grading 68.4% of iron and 1.5% of silicon dioxide with excellent metallisation and physical properties.

It also completed the flotation optimization test work, which confirmed a substantial increase in flotation recoveries from the previous 80% mass yield.

Cyclone is preparing a large drilling program for the summer, which should substantially expand the indicated mineral resource estimate and enable the design of a mining pit.

Iron Bear has also started test work for the design of dry tailings for the mining operation.

Its shares rose 3% in recent trading on Wednesday.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10