Dakota Gold Corporation has announced promising initial results from its 2025 drill campaign at the Richmond Hill Oxide Heap Leach Gold Project. The campaign's early assay results from 19 drill holes align with previous findings, notably including a significant intersection of 1.94 grams per tonne of gold over 60 meters, with 51.9 meters potentially suitable for heap leaching. The company currently operates two drills at the site, aiming to complete 24,384 meters of drilling using both Reverse Circulation and Core drilling techniques. These efforts are part of a larger strategy to define oxide and sulfide boundaries and prepare for a comprehensive Feasibility Study expected in early 2027. Dakota Gold is also working on an Initial Assessment with Cash Flow, targeting a 30,000 ton per day crushing circuit by mid-2025.
免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。