Lake Resources Says Front-End Engineering Design for Power Delivery to Argentina Lithium Brine Project Completed, Shares Jump 11%

MT Newswires Live
2025/07/02

Lake Resources (ASX:LKE) said a front-end engineering design study for the delivery of power to the firm's Kachi lithium brine project in Argentina was completed by YPF Luz, according to a Wednesday Australian bourse filing.

The study provides a system for connecting the project to the Argentine national grid, including proposed infrastructure routing, system specifications, and integration options tailored to the project's projected power demands.

The firm's shares jumped 11% in recent trading on Wednesday.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10