Inventus Mining Corp. has announced promising results from its grade-control drilling at the Pardo Gold Project, located 65 km northeast of Sudbury, Ontario. The drilling at the Trench 1 Bulk Sample Site revealed approximately 10,000 tonnes of material within 6 meters of the surface, with a weighted average grade of 4.10 gpt gold and a thickness of 1.78 meters. The top drill intercepts included grades as high as 12.59 gpt gold over 1.79 meters. The bulk sampling program is progressing on schedule, with the first 5,000-tonne sample from 007 North expected to be processed in late July, followed by the 10,000-tonne sample from Trench 1 in late August to early September. Inventus Mining Corp. is optimistic about the project's potential, having secured a processing path through McEwen Mining's Stock Mill, and sees this as a significant step towards de-risking the project and demonstrating the strong economics of extracting near-surface gold mineralization.
免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。