Anson Resources to Install Demonstration Plant Based on Estimated Minimum Flow Rate for Well at Utah Lithium Project

MT Newswires Live
08/07

Anson Resources (ASX:ASN) calculated the minimum estimated flow rate of 6,000 barrels of oil per day for its Bosydaba#1 well at the Green River lithium project in Utah through the existing tubing that was used during the exploration and test work program, based on data obtained from regular brine extraction from the well since the completion in April 2024, according to a Thursday Australian bourse filing.

This will allow the company to move forward with the plan to install a demonstration plant as it can supply the brine required without additional drilling or tubing replacement, the filing said.

The flow rate at the well can be increased by installing a pump at a specified depth to decrease the hydrostatic pressure, per the filing.

The company's shares rose nearly 2% in recent trading on Thursday.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10