Kinetiko Energy (ASX:KKO) said the drilling of production test well 271-KA03PT06 in South Africa was completed using optimized procedures, according to a Monday Australian bourse filing.
The 271-KA03PT06 well is the seventh at Brakfontein, designed to form the producing cluster to supply the planned pilot LNG plant and deliver maiden LNG sales.
Extended flow rate testing continues on 271-KA03PT10 to determine a stabilized flow rate. De-watering is progressing with gas flow increasing, resulting in wellhead shut-in pressure of over 13 Bar, per the filing.