Meeka Metals' Strategy at Western Australia Underground Gold Mine Seeks to Develop Multiple, Shallow Ore Levels

MT Newswires Live
2025/10/30

Meeka Metals (ASX:MEK) said its mining strategy at its first underground mine, Andy Well, located in Western Australia, for fiscal 2026 is to develop multiple ore levels within around 200 meters of surface across each of the Wilber, Judy, and Suzie lodes, according to a Thursday Australian bourse filing.

Access to the first ore development level, Wilber 1350, was established in September. Around 90 meters of ore development has been completed to date on the Wilber 1350 level, and grades have exceeded those predicted by the grade control model.

Three levels are being developed in ore, and four additional levels are planned to come online in the December quarter.

Wilber 1350 level ore development face grades include 4.4 meters at 14.8 grams-per-tonne grade of gold, 4.2 meters at 30.2 g/t grade of gold, and 4.2 meters at 22 g/t grade of gold.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10