Edgemode Commissions Feasibility Study for 300MW AI Data Center Campus in Spain

Reuters
01/28
Edgemode Commissions Feasibility Study for 300MW AI Data Center Campus in Spain

Edgemode Inc. has commissioned a site-specific feasibility study for a planned 300MW AI data center campus in Malpica, Spain. The project, part of Edgemode’s broader Spanish portfolio totaling over 1.5GW of planned IT capacity, will explore deploying hydrogen-ready solid oxide fuel cell systems powered by natural gas and integrated carbon capture solutions. The initiative aims to deliver resilient, scalable on-site baseload power to support the growing demand for AI-ready data center infrastructure in Europe. The Malpica campus is designed to meet Tier 3 standards and will feature a layered energy architecture, including options for solar and battery storage to enhance operational flexibility.

Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Edgemode Inc. published the original content used to generate this news brief via GlobeNewswire (Ref. ID: 9643524) on January 27, 2026, and is solely responsible for the information contained therein.

應版權方要求,你需要登入查看該內容

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10