GBM Resources Says Drilling At Queensland Gold Project Intersects Mineralization Outside Existing Mineral Resource Estimate

MT Newswires Live
01/29

GBM Resources (ASX:GBM) said stage one drilling at the 309 deposit, within the Twin Hills gold project in Queensland, intersected high-grade mineralization over 100 meters outside of the existing mineral resource estimate, according to a Thursday Australian bourse filing.

It encountered an intercept of 37 meters at 5 grams per tonne grade of gold from 225 meters.

The stage one drilling results provided structural information and vectors for targeting deeper "feeder zone" mineralization below the existing mineral resource estimate.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10