Barton Gold starts 30,000m Phase 2 RC drilling at Tunkillia Gold Project

Reuters
03/16
<a href="https://laohu8.com/S/BGDFF">Barton Gold</a> starts 30,000m Phase 2 RC drilling at Tunkillia Gold Project

Barton Gold said it has started Phase 2 reverse-circulation drilling at its Tunkillia Gold Project in South Australia, with Strike Drilling contracted for about 30,000 m. The company said the program is intended to support JORC (2012) Mineral Resource upgrades and target JORC (2012) Ore Reserves, alongside a pre-feasibility study and a mining lease application by end-2026. Barton Gold referenced a prior scoping study that outlined annual production of about 120,000 oz of gold and 250,000 oz of silver. The same study estimated unlevered, pre-tax life-of-mine operating cash of about AUD 2.7 billion and an NPV (7.5%) of about AUD 1.4 billion.

Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Barton Gold Holdings Ltd. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202603151825ACCESSWRNAPR_____1147942) on March 15, 2026, and is solely responsible for the information contained therein.

應版權方要求,你需要登入查看該內容

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10