Finder Energy Says First Phase Engineering Studies Confirm Technical Feasibility of Redeploying Floating Production Vessel to Indonesia Oil Fields Project

MT Newswires Live
03/19

Finder Energy Holdings (ASX:FDR) said the first phase engineering studies assessing the repurposing of the Petrojarl I floating production, storage, and offloading vessel for the Kuda Tasi and Jahal oil fields project confirmed the technical feasibility of redeploying the vessel to the project, according to a Thursday Australian bourse filing.

The studies showed no significant constraints to achieving targeted production rates across multiple operating scenarios. They confirmed the vessel can support production rates of around 25,000 barrels of oil per day, with increasing water handling over field life.

Its shares rose 1% in recent trading on Thursday.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10