Botala Energy Says Botswana CBM Project Production Well Achieves First Continuous Gas Flare

MT Newswires Live
09/25

Botala Energy (ASX:BTE) said the Pitse Pilot's central production 3.5B well at the Serowe coal bed methane (CBM) project in Botswana achieved its first continuous gas flare over Sunday and Monday, sustaining gas flow for over 30 hours with the flow rate of the well steadily increasing, according to a Friday Australian bourse filing.

Gas flow began earlier in the dewatering process than expected, with the water level still around 60 meters above the coal seam compared to the anticipated around 20 meters level, the company said. Dewatering has been slowed to bring the well on in a controlled and careful manner to protect the stimulated coal, the filing added.

The oil and gas company's shares declined past 1% in recent trading on Friday.

免責聲明:投資有風險,本文並非投資建議,以上內容不應被視為任何金融產品的購買或出售要約、建議或邀請,作者或其他用戶的任何相關討論、評論或帖子也不應被視為此類內容。本文僅供一般參考,不考慮您的個人投資目標、財務狀況或需求。TTM對信息的準確性和完整性不承擔任何責任或保證,投資者應自行研究並在投資前尋求專業建議。

熱議股票

  1. 1
     
     
     
     
  2. 2
     
     
     
     
  3. 3
     
     
     
     
  4. 4
     
     
     
     
  5. 5
     
     
     
     
  6. 6
     
     
     
     
  7. 7
     
     
     
     
  8. 8
     
     
     
     
  9. 9
     
     
     
     
  10. 10