China VTM Mining (00893) has announced that on September 24, 2026, Aba Mining, an indirectly wholly-owned subsidiary of the company, entered into two 2026 engineering contracts with a contractor in relation to the phase-two underground backfill and surface backfill facilities for the Maoling-Yanglongshan iron mine, with total contract amounts of RMB 3 million and RMB 1.95 million respectively.
The subject matter of the first 2026 engineering contract is that the contractor shall be responsible for the phase-two civil engineering and steel structure works for tailings backfill at the Maoling-Yanglongshan iron mine, namely the process of recycling washed tailings or mining waste to backfill underground mined-out areas in order to provide structural stability and reduce environmental risk, known as underground backfill. The scope of work includes the design, fabrication and construction of steel structures and auxiliary facilities for the underground backfill, together with the related civil engineering works, being the phase-two underground backfill. For the avoidance of doubt, the first 2026 engineering contract is an extension of the first 2025 engineering contract.
The subject matter of the second 2026 engineering contract is that the contractor shall be responsible for the civil engineering and site works, including the relevant geotechnical engineering interfaces, for the surface infrastructure and auxiliary facilities of the underground backfill system at the Maoling-Yanglongshan iron mine, being the surface backfill facilities. Aba Mining had previously also entered into a 2025 engineering contract with the contractor in relation to the phase-one underground backfill and magnetic separation facility upgrade works.
In light of ongoing environmental compliance obligations and China's domestic green mine framework in recent years, the underground backfill and surface backfill facilities form part of the group's operational upgrade to further reduce surface environmental impact. As part of Aba Mining's waste management, these backfill infrastructure and facilities can redirect substantial volumes of tailings back underground, thereby reducing the scale and risk of surface tailings storage facilities, while also stabilising underground rock structures, protecting surface infrastructure and safeguarding worker safety.
The magnetic separation facility upgrade works are intended to address the ongoing challenges facing China's steel supply chain. They support the group's gradual transformation of its downstream washing and processing capacity from producing existing high-grade iron concentrate to producing ultra-high-grade iron concentrate, namely material with a TFe content greater than 70%. This phased upgrade is consistent with the group's strategy as it continues to enhance and diversify its product mix in response to the current operating environment of the steel industry.