An implementation plan for accelerating the green and smart development of Yangtze River shipping for 2026 to 2030 has been issued by the Yangtze River Navigation Administration of the Ministry of Transport.
The plan will be carried out jointly with transport authorities of 14 provinces and municipalities along the Yangtze River system to advance digital and intelligent upgrading and green transformation of Yangtze River shipping, cultivate new growth drivers for green and smart consumption in inland waterway scenarios, and support a green, low-carbon, smart and efficient transport system.
Under the phased goals, by 2028 the number of new energy vessels in the Yangtze River system will double from 2025, a refueling and energy supply network matching vessel scale will be built, methanol bunkering services along the Yangtze River mainline will be available throughout the line, and vessel battery charging and swapping facilities in the Yangtze River Delta water network will basically form a network.
A green shipping corridor on the Yangtze River and electric vessel pilot zones such as the Yangtze River Delta will be basically established, with zero-carbon waterway transport corridors totaling 3,000 kilometers.
Comprehensive smart shipping pilot areas will be created, more than two smart shipping pilot routes will be opened, more than nine replicable typical smart shipping scenarios will be developed, and more than 60 smart vessels will be in operation.
By 2030, the number of new energy vessels in the Yangtze River system will continue to increase, zero-carbon waterway transport corridors will reach 4,000 kilometers, and a green and smart development system for Yangtze River shipping will be basically completed with full application of green and smart vessels, eco-friendly waterways, low-carbon and smart ports, and high-quality and efficient transport organization and management services.
A green shipping corridor on the Yangtze River will be built, with green and smart shipping development at an internationally advanced level.
The plan sets out 15 key tasks in five areas: accelerating the promotion and application of green and smart vessels, advancing the construction and maintenance of green and smart waterways, promoting green and low-carbon renewal and renovation of port facilities, improving high-standard support systems, and building a green shipping corridor on the Yangtze River.
It is supported by a task list for accelerating the green and smart development of Yangtze River shipping for 2026 to 2030, which specifies 59 listed tasks, refines work measures and clarifies responsibilities.
The plan calls for accelerating full-scenario application of new energy vessels, creating a group of demonstration routes for new energy vessels, and building vessel battery charging and swapping and methanol bunkering facilities according to local conditions to form an energy supply service network with coordinated supply and demand and effective connectivity.
It also calls for categorically promoting verification and rollout of intelligent assisted navigation technologies and improving supporting facilities for smart vessels.
Demonstration sections of green waterway projects will be built, comprehensive demonstration capacity for green maintenance will be enhanced, demonstration sections of smart waterways will be built, and a smart waterway service system will be completed.
Support will be given to building near-zero-carbon and zero-carbon demonstration ports, and to building zero-carbon service areas that integrate functions such as new energy supply and pollution prevention and control.
The plan calls for accelerating the establishment of a technical standards system for green inland river vessels and strengthening the technical standards system for smart vessels.
Approval procedures for green and smart vessels will be optimized, facilitation policy pilots will be carried out in a coordinated manner, and the emergency support system for green and smart vessels will be improved.