Following the conclusion of the summer railway travel season, the Lanzhou West Track Maintenance Section of China Railway Lanzhou Group Co., Ltd. has seized the "prime window" for autumn equipment maintenance, organizing staff to conduct systematic inspections of tracks, bridges, tunnels, and other track maintenance infrastructure. At the same time, the section adheres to a policy of "inspecting while repairing," precisely addressing various equipment defects to fully restore equipment condition and provide solid support for the safe and smooth operation of railway transportation. The section's autumn equipment inspection campaign is scheduled to run from August 31 to October 31, as reported by Wang Guanghui via photo.
The first photo shows staff from the Lanzhou Track Workshop of the Lanzhou West Track Maintenance Section carrying out rail shifting operations. The second photo depicts the same workshop's employees checking the geometric dimensions of turnouts. A third photo captures workers from the section cutting and replacing damaged rails at Lanzhou Station that were identified during the autumn inspection. Another photo shows employees measuring track vertical alignment, while a final image features a safety guard providing protective measures for the on-site workers.